Participants
1. Brett
2. guilhem
3. cloph
Agenda
* Salt refactoring
+ Merged Brett's 'cleanup' branch to master (except the submodule
integration: I merged it instead in order to preserve history)
+ TODO We should try to remove redundancy between 'base/' and 'tdf/'
directories, for instance 'base/mail/' and 'tdf/postfix/'
+ Are there any states/hosts that should be removed?
- obsolete grain-matching (Ubuntu 12 for instance)
- php5 (now superseded by 7.0, the two states should be merged)
+ Determine where/how CI is to be implemented.
- existing docker solution prefered for now
- should be properly jailed so the container can't escalate (move
it to a dedicated VM if that's the only solution)
* Migrations
+ Root servers kermit, pumbaa, bilbo2, intrepid, saber, and host-20150218 are gone
+ PENDING gimli migrated to vm201, all services are now prod-ready
but not live yet except OpenGrok (upgraded to 1.0) which is live
since earlier today (rdm#2077)
- AI guilhem: update can be migrated immediately (ensure that log
files are parsed properly first)
- dev-builds, dev-www, gimli's DNS records need to be updated at
the same time
- tinderbox: needs a MX, then can be updated independently
- TODO migrate /srv disk img from a raid0 dir to a raid1 dir
+ TODO migrate gandalf to our infra
- cloph: actually not really needed (can be considered a CI bot),
we could bring it behind our intranet instead
* charly rebooted on Friday at 12 CEST (dirty shutdown, cause still
unknown). tdfvm's mapping VM → hyper needs to be updated so we can
easily recreate transient VMs (instead of consulting libvirt logs…)
* Deployed LDAP auth to our TestLink instance, now waiting a couple of
weeks before proceeding with the wiki (to see if we need a schema
update)
* Our two MediaWiki instances are oddly slow, but help.libreoffice.org
will soon be replaced by static files on vm173; need to see if load
drops afterwards
* Gustl: AI guilhem: contact manitu and ask them to plug the cable to
another router port.
If that doesn't work, we should try to change router (or ask them to
update their switch?)
* Briefly going through Redmine tickets
https://redmine.documentfoundation.org/projects/infrastructure/issues?set_filter=1&sort=priority%3Adesc%2Cid%3Adesc&tracker_id=4
* Next meeting: August 15 at 16:30 UTC
--
Guilhem.
--
To unsubscribe e-mail to: website+unsubscribe@global.libreoffice.org
Problems? http://www.libreoffice.org/get-help/mailing-lists/how-to-unsubscribe/
Posting guidelines + more: http://wiki.documentfoundation.org/Netiquette
List archive: http://listarchives.libreoffice.org/global/website/
All messages sent to this list will be publicly archived and cannot be deleted
Context
- [libreoffice-website] Minutes from the Tue Jul 18 infra call · Guilhem Moulin
Privacy Policy |
Impressum (Legal Info) |
Copyright information: Unless otherwise specified, all text and images
on this website are licensed under the
Creative Commons Attribution-Share Alike 3.0 License.
This does not include the source code of LibreOffice, which is
licensed under the Mozilla Public License (
MPLv2).
"LibreOffice" and "The Document Foundation" are
registered trademarks of their corresponding registered owners or are
in actual use as trademarks in one or more countries. Their respective
logos and icons are also subject to international copyright laws. Use
thereof is explained in our
trademark policy.