I have uploaded BG6208 to the Feedback folder. I left a comment on pg 26 where the instructions listed made it impossible for me to duplicate. A rewrite seems to be needed to made with more detailed instructions.
At the bottom or pg 26, daylight savings time was mentioned with a query that involves it. Since this begins between March 8 and 16 and then ends between Nov 1 and 7, I am not sure that the query is accurate. Such a query would be complex since the time period begins on the second Sunday of March to end on the first Sunday of Nov.
I have downloaded BG6210-Database_Maintenance for review #1. Given the size of the file, this should not take as long as I anticipated when I updated the spreadsheet.
Dan